Serving Industry and the Nation
Our Work

Below is a list of work we’ve completed, which also includes work for the private sector.


RFP HSCG85-09-R-66R151

Contract number, agency POC w/ telephone number:
Purchase Orders (multiple), Integrated Marine Services, Inc., Larry Samino 619-429-0300.

Ship name, hull number, type and displacement:
USCGC Hamilton (WHEC-715), cutter, 3,050 tons full load, 378 ft.

Type of availability (drydock, dockside, etc.) and where performed:
Drydock, 32nd Street Naval Station, San Diego, CA

Original contract commencement and completion dates, actual commencement and completion dates, and explanation of (i.e. reasons for) schedule slippage/extensions, if any:
December 12, 2008 through January 12, 2009

Award and final (award plus growth) contract prices, including the total number of growth work changes and scope of those changes:
Basic Award: $ 13,113.00. Growth work total additional $12,663.00 for areas of preservation and painting due to welding additional welding and tank work. Final total: $25,776.00

Total number of actual man-hours expended and how many of those hours were for additional/changed work:
Basic man-hours: 416 Additional/Change work: 402 man-hours.

The number of and reasons for any deficiency reports issued by the customer for each specification item. Provide copies of these reports if requested:
None

Discuss problems encountered and the offeror’s corrective actions:
None.


RFP HSCG85-09-R-66R151

Contract number, agency POC w/ telephone number:
GSA #GS06F0061M, Contract#W91CRB-06-F-017, Les Pearson 619-556-5561.

Ship name, hull number, type and displacement:
YRBM-48, Berthing Barge, 760 tons full displacement, 150 ft.

Type of availability (drydock, dockside, etc.) and where performed:
Dockside availability accomplished in Hawaii work performed: Exterior Freeboard and Hull from upper Boottop Limit to Main Deck Edges throughout Barge; exterior surfaces of Superstructure; all vertical surface above Main Deck, Main and 03 Level (Roof Deck); Interior surfaces of barge, including overhead; Bulkheads, racks and bunks; and removal of non-skid on deck areas. Total square footage for all areas: 125,243

Original contract commencement and completion dates, actual commencement and completion dates, and explanation of (i.e. reasons for) schedule slippage/extensions, if any:
June 22, 2006 through August 11, 2006.

Award and final (award plus growth) contract prices, including the total number of growth work changes and scope of those changes:
$388,645.00

Total number of actual man-hours expended and how many of those hours were for additional/changed work:
4,616 man-hours to complete job.

The number of and reasons for any deficiency reports issued by the customer for each specification item. Provide copies of these reports if requested:
None

Discuss problems encountered and the offeror’s corrective actions:
None


RFP HSCG85-09-R-66R151

Contract number, agency POC w/ telephone number:
Purchase Orders (multiple), Crowley Liner Services, Inc. Mark Harris, 619-606-0142

Ship name, hull number, type and displacement:
SS CURTISS (T-AVB 4) Aviation Maintenance Logistics Ship, 23,800 long tons, 602 ft.

Type of availability (drydock, dockside, etc.) and where performed:
Dockside, Mole Pier, Naval Station, San Diego, CA

Original contract commencement and completion dates, actual commencement and completion dates, and explanation of (i.e. reasons for) schedule slippage/extensions, if any:
Original Commencement Date: January 14, 2009 Note, job is still working due to additional items. Scheduled completion: June 15, 2009.

Award and final (award plus growth) contract prices, including the total number of growth work changes and scope of those changes:
Award plus growth: $370,143.00. This job has experienced a growth of 50% due to additional Topside and Tank work that included 50 cal. gun station and all deck equipment as well as hatch covers with markings. Tank work to include the Forepeak Tank, SWB Tank, and Lower Anti-Roll Tank. YYK has accomplished preservation tasking including application of mil spec products.

Total number of actual man-hours expended and how many of those hours were for additional/changed work:
Total man-hours: 4,726. Additional man-hours: 345 to accomplish the change work.

The number of and reasons for any deficiency reports issued by the customer for each specification item. Provide copies of these reports if requested:
None

Discuss problems encountered and the offeror’s corrective actions:
None


Other projects:

USS NIMITZ (CVN-68), USS RONALD REAGAN (CVN-76), USS GEORGE WASHINGTON (CVN-73) USS DECATUR (DDG-73), USS GRIDLEY (DDG-101), USS BENFOLD (DDG-65), USS MILIUS (DDG-69) USS PINCKNEY (DDG-91)


Areas of work include:

Island Structure, Weapons Elevators, Seateal Platforms and TV-DTS WSC-8 and SMQ-11, Main Mast, Machinery Space Bilges, Shaft Alley, State Rooms, GTM and GTG Intake Areas, Stern Deck, Superstructure and Underwater Body Hull.